Active Living Centre - Draft Design Options

The 2018 Greater Vernon Recreation Master Plan specifically identified the need for the following facilities as the highest priority:
• Indoor aquatics facilities
• Community gymnasiums
• Dedicated programming spaces
• Fitness space
• Indoor Walking/Jogging Track

Public participation is paramount to the success of the Feasibility Study and we recognize the importance and value of engaging residents, stakeholders and partners in decision making. As such several engagement opportunities have taken place to understand community needs, including:
• Focus Groups  • Pop-up events • Open Houses • Surveys • One-on-one interviews

A total of six focus groups were held in the fall of 2019 to gather a first round of feedback for the Feasibility Study. The focus groups were made up of participants from a wide range of user groups.
An online survey was open from October 21 to November 17, 2019.
389 unique users completed the survey.

The feedback received (shown below) was used to inform the proposed design options.


The resulting Four design options for a new Active Living Centre and upgrades to the Vernon Aquatic Centre have been prepared for your consideration. These design options have been informed by community input to date.

All Options must:

-  Address the priorities identified in the 2018 Recreation Master Plan

-  Allow existing Vernon Aquatic Centre to remain open during construction of new facilities

Notes: 

All pool options include 1m and 3m Diving Boards, Hot Tub, Sauna and Steam Room. 

Options. 1 & 2 propose closure of the existing Vernon Aquatic Centre (pool and fitness area only).


CLOSED: This survey has concluded.